Construction of 2 lane with paved shoulder including geometric improvement from km 16+000 to 32+500 of stretch Tarku-Ravangla of NH-510 on EPC basis under SARDP-NE Phase “A” in the state of Sikkim

Construction of 2 lane with paved shoulder including geometric improvement from km 16+000 to 32+500 of stretch Tarku-Ravangla of NH-510 on EPC basis under SARDP-NE Phase “A” in the state of Sikkim

THE OVERVIEW

The project story

Construction of 2 lane with paved shoulder including geometric improvement from km 16+000 to 32+500 of stretch Tarku-Ravangla of NH-510 on EPC basis under SARDP-NE Phase “A” in the state of Sikkim

Client (as stated in company profile): M/s S & P Infrastructure Developers (P) Ltd. (NHIDCL)
Length/area: 16.500 km (2-lane)
Assignment: Detailed Design Consultant for Slope Protection Works
Status in Sep 2026 source: Completed
31Source profile No.
16.500 km (2-lane)Length / Area
Detailed Design Consultant for Slope Protection WorksAssignment
CompletedReported Status (Sep 2026)