Widening/ Improvement to 4 (Four) lane with Shoulder from Km 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village-Dillai Section (Pkg-6) of NH-29 in the State of Assam on EPC mode.

Widening/ Improvement to 4 (Four) lane with Shoulder from Km 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village-Dillai Section (Pkg-6) of NH-29 in the State of Assam on EPC mode.

THE OVERVIEW

The project story

Widening/ Improvement to 4 (Four) lane with Shoulder from Km 113+300 to Km 146+250 (Design Chainage 113+830 to 145+712) of Kwaram Taro Village-Dillai Section (Pkg-6) of NH-29 in the State of Assam on EPC mode.

Client (as stated in company profile): NHIDCL
Length/area: 6.20 km (4-lane)
Assignment: Falling Weight Deflectometer (FWD) Test
Status in Sep 2026 source: Completed
29Source profile No.
6.20 km (4-lane)Length / Area
Falling Weight Deflectometer (FWD) TestAssignment
CompletedReported Status (Sep 2026)