Widening/Improvement to 4 lane with paved shoulders from Km 51+246 to Km 66+000 (Design Chainage 50+710 Km to 65+923 Km) of Parokhuwa - Dokmoka section (Package -2) of NH-29 in the state of Assam on EPC mode.
Client (as stated in company profile): NHIDCL
Length/area: 3.76 km (4-lane)
Assignment: Falling Weight Deflectometer (FWD) Test
Status in Sep 2026 source: Completed
← Back to Projects
PROJECTS / MAVERICK MERNOK
Widening/Improvement to 4 lane with paved shoulders from Km 51+246 to Km 66+000 (Design Chainage 50+710 Km to 65+923 Km) of Parokhuwa - Dokmoka section (Package -2) of NH-29 in the state of Assam on EPC mode.
Widening/Improvement to 4 lane with paved shoulders from Km 51+246 to Km 66+000 (Design Chainage 50+710 Km to 65+923 Km) of Parokhuwa - Dokmoka section (Package -2) of NH-29 in the state of Assam on EPC mode.
THE OVERVIEW
The project story
28Source profile No.
3.76 km (4-lane)Length / Area
Falling Weight Deflectometer (FWD) TestAssignment
CompletedReported Status (Sep 2026)
CONNECT WITH MAVERICK
Talk to our team ↗