Widening/ Improvement to 4(Four) Lane with Paved Shoulder From Km 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with Proposed Daboka Bypass of Daboka - Parokhaowa (Package 1) of NH - 29 in the State of Assam on EPC mode under NH(O) NE.
Client (as stated in company profile): NHIDCL
Length/area: 7.84 km (4-lane)
Assignment: Falling Weight Deflectometer (FWD) Test
Status in Sep 2026 source: Completed
← Back to Projects
PROJECTS / MAVERICK MERNOK
Widening/ Improvement to 4(Four) Lane with Paved Shoulder From Km 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with Proposed Daboka Bypass of Daboka - Parokhaowa (Package 1) of NH - 29 in the State of Assam on EPC mode under NH(O) NE.
Widening/ Improvement to 4(Four) Lane with Paved Shoulder From Km 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with Proposed Daboka Bypass of Daboka - Parokhaowa (Package 1) of NH - 29 in the State of Assam on EPC mode under NH(O) NE.
THE OVERVIEW
The project story
27Source profile No.
7.84 km (4-lane)Length / Area
Falling Weight Deflectometer (FWD) TestAssignment
CompletedReported Status (Sep 2026)
CONNECT WITH MAVERICK
Talk to our team ↗