Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km)
Client (as stated in company profile): M/s Jayshree Internationals
Length/area: 53.400 km (2-lane)
Assignment: Design & Drawing Proof Checking.
Status in Sep 2026 source: On-going
← Back to Projects
PROJECTS / MAVERICK MERNOK
Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km)
Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km)
THE OVERVIEW
The project story
26Source profile No.
53.400 km (2-lane)Length / Area
Design & Drawing Proof Checking.Assignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK
Talk to our team ↗