Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 130.00 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode.
Client (as stated in company profile): M/s A K Shivhare Infrastructure Pvt. Ltd. (NHIDCL)
Length/area: 11.029 km (2-lane)
Assignment: Design & Drawing Proof Checking.
Status in Sep 2026 source: On-going
← Back to Projects
PROJECTS / MAVERICK MERNOK
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 130.00 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode.
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 130.00 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode.
THE OVERVIEW
The project story
25Source profile No.
11.029 km (2-lane)Length / Area
Design & Drawing Proof Checking.Assignment
On-goingReported Status (Sep 2026)