← Back to Projects PROJECTS / MAVERICK MERNOK

Construction of Border Security New Design Fence in Original, washed away and at 25 Riverine gaps along Indo-Pak Border in Jammu Sector. (Length 4363 m)

Construction of Border Security New Design Fence in Original, washed away and at 25 Riverine gaps along Indo-Pak Border in Jammu Sector. (Length 4363 m)

THE OVERVIEW

The project story

Construction of Border Security New Design Fence in Original, washed away and at 25 Riverine gaps along Indo-Pak Border in Jammu Sector. (Length 4363 m)

Client (as stated in company profile): M/s A & T Infracon Pvt. Ltd. (CPWD)
Length/area: 4.363 km
Assignment: Detailed Design Consultant
Status in Sep 2026 source: On-going
22Source profile No.
4.363 kmLength / Area
Detailed Design ConsultantAssignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK

Discuss your requirements

Talk to our team ↗