Preparation of Inception Report, Feasibility Report & Detailed Project Report (DPR) for 10 Nos. of Tunnels having an Aggregate Length of about 12.44 km
Client (as stated in company profile): M/s Techcomm Urban Management Consultants (TUMC) Pvt. Ltd.- Path Finder Techno Consultant (MSRDC)
Length/area: 12.44 km (8-lane)
Assignment: DPR
Status in Sep 2026 source: On-going
← Back to Projects
PROJECTS / MAVERICK MERNOK
Preparation of Inception Report, Feasibility Report & Detailed Project Report (DPR) for 10 Nos. of Tunnels having an Aggregate Length of about 12.44 km
Preparation of Inception Report, Feasibility Report & Detailed Project Report (DPR) for 10 Nos. of Tunnels having an Aggregate Length of about 12.44 km
THE OVERVIEW
The project story
20Source profile No.
12.44 km (8-lane)Length / Area
DPRAssignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK
Talk to our team ↗