← Back to Projects PROJECTS / MAVERICK MERNOK

Improvement/ Up-gradation of existing 2-lane road to 4-lane divided highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal-Kohima Road (NH-39) (Design Chainage from 274+610 to Km 287+000) in the state of Manipur on EPC Mode

Improvement/ Up-gradation of existing 2-lane road to 4-lane divided highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal-Kohima Road (NH-39) (Design Chainage from 274+610 to Km 287+000) in the state of Manipur on EPC Mode

THE OVERVIEW

The project story

Improvement/ Up-gradation of existing 2-lane road to 4-lane divided highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal-Kohima Road (NH-39) (Design Chainage from 274+610 to Km 287+000) in the state of Manipur on EPC Mode

Client (as stated in company profile): M/s A K Shivhare Infrastructure Pvt. Ltd. (NHIDCL)
Length/area: 12.390 km (4-lane)
Assignment: Detailed Design Consultant
Status in Sep 2026 source: On-going
17Source profile No.
12.390 km (4-lane)Length / Area
Detailed Design ConsultantAssignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK

Discuss your requirements

Talk to our team ↗