Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.000) under SARDP-NE Phase "A" on EPC Mode in the State of Sikkim-(Package-VI)
Client (as stated in company profile): M/s JRA Infrastructure Ltd. (NHIDCL)
Length/area: 15.000 km (2-lane)
Assignment: Detailed Design Consultant for Slope Protection Works
Status in Sep 2026 source: Completed
← Back to Projects
PROJECTS / MAVERICK MERNOK
Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.000) under SARDP-NE Phase "A" on EPC Mode in
Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.000) under SARDP-NE Phase "A" on EPC Mode in...
THE OVERVIEW
The project story
16Source profile No.
15.000 km (2-lane)Length / Area
Detailed Design Consultant for Slope Protection WorksAssignment
CompletedReported Status (Sep 2026)