← Back to Projects PROJECTS / MAVERICK MERNOK

Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 58.840 to Km 75.000) under SARDP-NE Phase "A" on EPC Mode in

Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 58.840 to Km 75.000) under SARDP-NE Phase "A" on EPC Mode in...

THE OVERVIEW

The project story

Construction of 2-lane Specification Road with Paved Shoulder as Re-alignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 58.840 to Km 75.000) under SARDP-NE Phase "A" on EPC Mode in the State of Sikkim-(Package-V)

Client (as stated in company profile): M/s JRA Infrastructure Ltd. (NHIDCL)
Length/area: 16.160 km (2-lane)
Assignment: Detailed Design Consultant for Slope Protection Works
Status in Sep 2026 source: Completed
15Source profile No.
16.160 km (2-lane)Length / Area
Detailed Design Consultant for Slope Protection WorksAssignment
CompletedReported Status (Sep 2026)
CONNECT WITH MAVERICK

Discuss your requirements

Talk to our team ↗