Construction of 2 Lane ROB at Rail Section Crossing No.70 at Km (Deoband-Nanota Road) 148/3 - Devband Railway Station On Meerut-Saharanpur Rail Section In Distt. Saharanpur
Client (as stated in company profile): M/s Woodhill Infra Pvt. Ltd. (Uttar Pradesh State Bridge Corporation Ltd.)
Length/area: 6.20 km (4-lane)
Assignment: Detailed Design Consultant
Status in Sep 2026 source: On-going
← Back to Projects
PROJECTS / MAVERICK MERNOK
Construction of 2 Lane ROB at Rail Section Crossing No.70 at Km (Deoband-Nanota Road) 148/3 - Devband Railway Station On Meerut-Saharanpur Rail Section In Distt. Saharanpur
Construction of 2 Lane ROB at Rail Section Crossing No.70 at Km (Deoband-Nanota Road) 148/3 - Devband Railway Station On Meerut-Saharanpur Rail Section In Distt. Saharanpur
THE OVERVIEW
The project story
12Source profile No.
6.20 km (4-lane)Length / Area
Detailed Design ConsultantAssignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK
Talk to our team ↗