Construction of Existing Two Lane To 4-Lane with paved Shoulder from Carriageway Ch.0+000 from Kekri Bypass to terminating point of NH-52 (Km 146+330 of NH-52) at Km 51+300 (Total Length 53.100 Km) Section of SH-26 in the State of Rajasthan.
Client (as stated in company profile): M/s Heera Ram Godhara (RSRDC)
Length/area: 53.100 km (4-lane)
Assignment: Detailed Design Consultancy
Status in Sep 2026 source: On-going
← Back to Projects
PROJECTS / MAVERICK MERNOK
Construction of Existing Two Lane To 4-Lane with paved Shoulder from Carriageway Ch.0+000 from Kekri Bypass to terminating point of NH-52 (Km 146+330 of NH-52) at Km 51+300 (Total Length 53.100 Km) Section of SH-26 in the State of Rajasthan.
Construction of Existing Two Lane To 4-Lane with paved Shoulder from Carriageway Ch.0+000 from Kekri Bypass to terminating point of NH-52 (Km 146+330 of NH-52) at Km 51+300 (Total Length 53.100 Km) Section of SH-26 in the State of Rajasthan.
THE OVERVIEW
The project story
5Source profile No.
53.100 km (4-lane)Length / Area
Detailed Design ConsultancyAssignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK
Talk to our team ↗