← Back to Projects PROJECTS / MAVERICK MERNOK

Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Lavamore (

Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Lavamore (...

THE OVERVIEW

The project story

Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Lavamore (Km 61.10) to Start of Pedong Bypass (Km 79.700) and from Reshi (Km 96.254) to Rhenock (Km 101.554) along NH-717A & from Rhenock (Km 0.00) to Rongli Bazaar (Km 15.300) along NH-717B in the State of Sikkim and West Bengal"

Client (as stated in company profile): NHIDCL
Length/area: 39.200 km (2-lane)
Assignment: DPR
Status in Sep 2026 source: On-going
2Source profile No.
39.200 km (2-lane)Length / Area
DPRAssignment
On-goingReported Status (Sep 2026)
CONNECT WITH MAVERICK

Discuss your requirements

Talk to our team ↗